Project Overview
This project involved the installation and termination of structured cabling, Optical Network Units (ONUs), CCTV surveillance systems, and Access Control Systems (ACS) for NAFFCO Electromechanical Co. LLC. The scope covered apartment-level network cabling, telecom and CCTV rack installations, access control peripherals, ACS cabinets, and entry and exit gate barriers.
The work was planned in phases to ensure systematic execution, organized cable management, accurate labeling, and coordinated installation across the designated buildings. The project also included the termination of CAT6 and CAT6A cables, installation of network rack components, and integration of access control equipment with the relevant security systems.
NAFFCO Electromechanical Co. LLC
Structured Cabling and Security Systems Installation
CAT6/CAT6A Termination, ONU Setup, CCTV Installation, Access Control Systems, and Gate Barrier Installation
Project Objectives
Complete CAT6 cable termination across 1,110 apartment points.
Install and organize 153 Optical Network Units (ONUs).
Install and terminate 170 CCTV cameras and their associated cabling.
Complete the termination and setup of CCTV IDF and MDF racks.
Install access control peripherals across 47 full sets and 71 door contacts.
Install and terminate ACS cabinets with organized internal cable routing.
Install and connect one pair of entry and exit gate barriers.
Maintain consistent labeling, cable dressing, and termination standards throughout the project.
CAT6 Cable Termination Inside Apartments
A total of 1,110 CAT6 cable points were included in the apartment cabling scope. The work involved:
- Termination of CAT6 cables at both ends.
- Ferruling at both ends for identification.
- Labeling at both ends to support easier identification, testing, and future maintenance.
Optical Network Unit (ONU) Setup – 153 Units
The ONU installation scope included the preparation and organization of network termination points and associated equipment.
The work involved:
- Installation of RJ45 keystone jacks onto patch panels.
- Installation of cable managers.
- Proper cable dressing and routing.
- Dust removal and cleaning after installation.
- Installation of ONU doors and identification tags.
All fiber optic works were excluded from the project scope.
CCTV Camera Installation and Termination – 170 Units
The CCTV installation covered 170 cameras, including CAT6A cable termination and the preparation of connections at the IDF racks.
The work involved:
- Termination of CAT6A cables for CCTV cameras.
- Installation of CCTV cameras.
- Termination of RJ45 keystone jacks inside IDF racks.
- Proper cable identification and organized termination.
CCTV IDF Rack Termination – 6 Units
The project included the termination and setup of six CCTV Intermediate Distribution Frame (IDF) racks.
The work involved:
- Installation of patch panels, cable managers, and switches.
- Patching and labeling of CAT6A cables.
- Organized cable routing and dressing within the racks.
Fiber optic works were excluded.
CCTV MDF Rack Termination – 1 Unit
One Main Distribution Frame (MDF) rack was included in the project scope.
The work involved:
- Installation of patch panels, cable managers, and switches.
- Proper patching and organization of CAT6A cables.
- Arrangement of rack components for accessible connections and maintenance.
Fiber optic works were excluded.
Access Control System (ACS) Peripherals
47 Full Sets and 71 Door Contacts
The ACS scope covered the installation and termination of access control peripherals required for controlled door access.
The work involved the installation and termination of:
- Door locks.
- Push buttons.
- Emergency break glass units.
- Door contacts.
- Card readers.
The installation was planned to ensure that the individual door peripherals were connected and arranged according to the designated access control requirements.
ACS Cabinet Installation and Termination – 6 Units
Six ACS cabinets were included in the project scope.
The work involved:
- Installation of ACS enclosures.
- Proper cable dropping inside the enclosures.
- Cable termination using lugs and ferrules.
- Organized cable dressing inside internal trunking.
These activities supported structured cable management and easier access for inspection and maintenance.
Gate Barrier Installation – 1 Pair
The project included the installation of one pair of gate barriers for entry and exit control.
The work involved:
- Installation of entry and exit barriers.
- Wiring and motor setup.
- Connection to the designated control system.
- Integration with the ACS or relevant security systems, as required.
Project Quantity Breakdown
A summary of the installation quantities covered under the NAFFCO project scope.
| No. | Service Description | Quantity |
|---|---|---|
| 01 | CAT6 Cable Termination Inside Apartments | 1,110 points |
| 02 | Optical Network Unit (ONU) Setup | 153 units |
| 03 | CCTV Camera Installation and Termination | 170 units |
| 04 | CCTV IDF Rack Termination | 6 units |
| 05 | CCTV MDF Rack Termination | 1 unit |
| 06 | ACS Peripheral Installation | 47 full sets |
| 07 | Door Contact Installation | 71 units |
| 08 | ACS Cabinet Installation and Termination | 6 units |
| 09 | Gate Barrier Installation | 1 pair |
Project Execution and Phasing
The project was structured into four major phases to support coordinated execution, progress monitoring, and milestone-based payments.
Apartment CAT6 Cable Termination
Termination, ferruling, and labeling of CAT6 cables across the 1,110 apartment points.
Payment milestone: Upon completion of 25% of apartment cable terminations.
ONU Setup and CCTV Camera Installation
Installation of 153 ONUs and installation and termination of 170 CCTV cameras, with associated cabling and rack-side connections.
Payment milestone: Upon installation of 50% of the ONUs and CCTV cameras.
Rack Termination and Access Control Installation
Completion of IDF and MDF rack terminations, installation of ACS peripherals and cabinets, and associated cable management activities.
Payment milestone: Upon completion of 75% of rack terminations and ACS peripheral installation.
Project Completion and Handover
Final completion of the agreed installation scope, review of completed work, and handover of the installed systems.
Payment milestone: Upon 100% project completion.
Project Execution Standards
Ferruling and labeling of cables at both ends wherever specified.
Proper cable dressing, patching, and routing within racks and ACS cabinets.
Installation of patch panels, cable managers, switches, and associated components within the designated racks.
Removal of dust and debris following ONU installation.
Execution according to the planned project stages and payment milestones.
Fiber optic works were excluded from the ONU and CCTV rack-related activities specified in the scope.
Project Outcome and Handover
The project scope established a coordinated installation framework for apartment network cabling, ONU setup, CCTV surveillance, access control, and gate barrier systems. The defined quantities and phased execution plan supported systematic progress tracking across the different installation activities.
Upon completion, the project handover was to cover the agreed installation scope, including the associated cable terminations, rack arrangements, access control peripherals, cabinets, and gate barriers.
Note: Final completion status, testing results, commissioning records, and client acceptance should be added once confirmed.
Conclusion
The NAFFCO Electromechanical Co. LLC project demonstrates a comprehensive scope of structured cabling and security system installation, covering 1,110 apartment CAT6 points, 153 ONUs, 170 CCTV cameras, distribution racks, access control peripherals, ACS cabinets, and an entry and exit gate barrier pair. With clearly defined work packages, organized termination requirements, and phased milestones, the project was structured to support efficient installation, coordinated execution, and a systematic handover of the specified network and security infrastructure.